例句 /

The last 2 parts often need to add some typical components, such as Organization Charts (Discussion); Phasing Charts and Schedules (Discussion); Description of Quality, Reliability, Maintainability and Cost Controls (Discussion); Evaluation of Manpower Ne

The last 2 parts often need to add some typical components, such as Organization Charts (Discussion); Phasing Charts and Schedules (Discussion); Description of Quality, Reliability, Maintainability and Cost Controls (Discussion); Evaluation of Manpower Ne

后两部分除了本文之外,常要附上一些典型成分,如:组织图表(讨论);分期图表和时间表(讨论);质量、可靠性、可维护性及成本控制(讨论);所需人力的数量(讨论);分包商计划(讨论);工程和工程支持(讨论);制造计划(讨论);设备和设施清单(讨论或能力);有关经验报告(能力);传记(讨论或能力);等等。