例句 /

Refering to the platform screen door (PSD) system applied in Guangzhou Metro Line 1 &Line 2, this paper analyzes the supervision and control functions of the continued Automatic Train Control (ATC) system (LZB), which is supported by the on-board and trac

Refering to the platform screen door (PSD) system applied in Guangzhou Metro Line 1 &Line 2, this paper analyzes the supervision and control functions of the continued Automatic Train Control (ATC) system (LZB), which is supported by the on-board and trac

摘要基于广州地铁1、2号线屏蔽门系统工程,分析、介绍了由车载和轨旁设备支持实施的LZB连续自动列车控制系统的控制和监督功能,从安全、合理的角度综述了信号系统与屏蔽门系统之间的接口控制关系。