A node-flow control and switch concept are proposed and a logistics scheduling model is built for solving this problem.
A node-flow control and switch concept are proposed and a logistics scheduling model is built for solving this problem.
为此,提出了节点流控制及切换的概念,建立了生产调度模型,并采用多目标分层求解调度模型。