例句 /

Based on the moveable-bed model tests and some relative studies, it is found that the proposal reservoir for the Hongshiyan Hydropower Station will be a heavy deposit reservoir, its sand-flushing sluice could not effectively de-silt and serious hidden-tro

Based on the moveable-bed model tests and some relative studies, it is found that the proposal reservoir for the Hongshiyan Hydropower Station will be a heavy deposit reservoir, its sand-flushing sluice could not effectively de-silt and serious hidden-tro

摘要待建的红石岩水电站水库属严重淤沙型水库,通过动床水工模型试验和有关研究分析发现,其冲沙闸排沙效果不理想,引水隧洞存在进沙严重的隐患。