例句 /

3 The Permit Holder shall deposit with the Director 3 sets of 1 to 1000 scale layout drawings showing the works boundaries, drainage channel, ancillary road alignments and any other facilities assessed in the EIA Report; the locations of environmental mit

3 The Permit Holder shall deposit with the Director 3 sets of 1 to 1000 scale layout drawings showing the works boundaries, drainage channel, ancillary road alignments and any other facilities assessed in the EIA Report; the locations of environmental mit

许可证持有人须向署长存放下列文件,计有:3套1:1000比例的设计规划图则,显示工程界线、排水道、附属道路的路线及环评报告所评估的任何其他设施;环评报告所建议的环境缓解措施的地点;以及一份解释说明。