This paper introduces the background and purposes of employing BOT (Building-operation-Transfer) mode in the extension project of Shenzhen Metro Line 4 as well as the legal basis, negotiations, reached agreements and practical significance of BOT mode.
详情正文
登录后查看完整内容
使用 DeepEvidence / 梅斯账号登录,新用户可在登录页面注册。
登录 / 注册登录成功后将返回当前页面,继续浏览。