例句 /

Because the channel bed was adjusted by scouring and silting in long-term, the required period to reach basically equilibrium was predicted based on the typical and assemble hydrographic data in long series after the building of Lijia flume dam.

Because the channel bed was adjusted by scouring and silting in long-term, the required period to reach basically equilibrium was predicted based on the typical and assemble hydrographic data in long series after the building of Lijia flume dam.

应用李家峡建坝后典型水文年长系列的组合资料,预报了河床经长期冲淤调整后达到基本平衡需要的时间。