例句 /

5 The Permit Holder shall ensure that all runoff from the construction site is routed through oil/grit separators and/or sediment basins/traps before discharge into nearby receiving waters.

5 The Permit Holder shall ensure that all runoff from the construction site is routed through oil/grit separators and/or sediment basins/traps before discharge into nearby receiving waters.

许可证持有人须确保建造工地流出的所有径流,均先流经油污/砂砾分隔器及/或沉淀池/沉积物捕集装置,才排放出附近的接收水体。