6 Dredging/excavation shall be carried out in accordance with dredging/excavation plan deposited under Condition 2.5 above.
6 Dredging/excavation shall be carried out in accordance with dredging/excavation plan deposited under Condition 2.5 above.
须按照上述第2.5项条件所存放的挖泥/挖掘计划,进行挖泥/挖掘工作。