例句 /

Most part of the North Trunk Line of WanjiaZhai Yellow River Delivery Project has to pass through the zone of collapsible loess, so the collapsibility of the loess foundation becomes the main engineering geological problem therein.

详情正文

登录后查看完整内容

使用 DeepEvidence / 梅斯账号登录,新用户可在登录页面注册。

登录成功后将返回当前页面,继续浏览。