例句 /

By adjusting pile lengths and pile numbers, the settlement of pile foundation increased from the main span to the Side span to such an extent that it matched the settlement of the embankment at both ends of bridges without any special treatment.

By adjusting pile lengths and pile numbers, the settlement of pile foundation increased from the main span to the Side span to such an extent that it matched the settlement of the embankment at both ends of bridges without any special treatment.

分别通过调整桩长和桩数,使桩基沉降从桥梁主跨逐步增大,而在路桥连接处使边跨桥墩沉降与桥坡填土沉降基本一致,实现路桥沉降协同,从而开辟了解决桥头跳车问题的新途径。