Connection between handrail and platform beam shall be welding. It shall be 8mm weld around the base plate of past on side.There shall be gap for water outlet.
Connection between handrail and platform beam shall be welding. It shall be 8mm weld around the base plate of past on side.There shall be gap for water outlet.
立柱与扶手管、横杆间采用销钉固定或焊接固定的方式,具体的连接方式见后面的的详细要求。