例句 /

If after completing a trial run but before receiving the operation license, an oil refinery operator has constructed or leased an oil storage facility that has a capacity greater than the required security stockpile and it has submitted the documents spec

If after completing a trial run but before receiving the operation license, an oil refinery operator has constructed or leased an oil storage facility that has a capacity greater than the required security stockpile and it has submitted the documents spec

石油炼制业于领得经营许可执照前,在试车完成后,如已依计画设置或租用法定安全存量以上之储油设备,并检附前项第三款规定之文件,经向中央主管机关申请核准,得销售其试车完成后所生产之石油制品。