Combined with debugging word of 2×600 MW units in second-phase project of Datong Power Plant no.2, the mechanism and loop of a new coordinated control system based on direct energy balance (DEB) have been analysed.
Combined with debugging word of 2×600 MW units in second-phase project of Datong Power Plant no.2, the mechanism and loop of a new coordinated control system based on direct energy balance (DEB) have been analysed.
摘要结合大同第二发电厂二期2×600MW机组的调试,对一种基于新的直接能量平衡协调控制机理及其控制回路进行了分析。