In this paper, based on the inconsistency between the planning design of power station and operating performance of hydro-turbine, the technical feasibility and influence on engineering practice of the maximum output setting (MOS) as a solution have been
In this paper, based on the inconsistency between the planning design of power station and operating performance of hydro-turbine, the technical feasibility and influence on engineering practice of the maximum output setting (MOS) as a solution have been
摘要为解决水电站规划设计与水轮机运行特性之间的矛盾,分析了在高水头下可能引起的机组运行问题,以及采用设置最大出力作为预防措施在技术上的可行性和对工程的影响,对清江水布垭电站机组设置最大出力的设计优化进行了介绍。