例句 /

In the course of soft soil foundation ditch construction, according to the soil condition of main foundation ditch and characteristics of geology and geomorphology around in Yaojiang Lock, proper construction technology was adopted to achieve satisfactory

In the course of soft soil foundation ditch construction, according to the soil condition of main foundation ditch and characteristics of geology and geomorphology around in Yaojiang Lock, proper construction technology was adopted to achieve satisfactory

摘要介绍根据姚江船闸主体基坑的土质条件和周边的地形、地貌特点,在软土地基基坑施工过程中因地制宜采取相应的施工工艺,以尽可能少的施工投入取得满意的施工效果。