例句 /

3 After cable duct construction, the Permit Holder shall reinstate the affected stream bed of Ho Chung River to its original conditions using natural substratum.

3 After cable duct construction, the Permit Holder shall reinstate the affected stream bed of Ho Chung River to its original conditions using natural substratum.

在电缆管道建成后,许可证持有人须用天然底土修复受影响的蚝涌溪流河床,使其回复原貌。