Abstract: In view of technical problem of hydro-pyro processing of lead anode slime,by changing technological conditions of pretreatment and optimizating technological procedure,the cost of process decreased and the recovery of Ag increased to 98.34%,whic
Abstract: In view of technical problem of hydro-pyro processing of lead anode slime,by changing technological conditions of pretreatment and optimizating technological procedure,the cost of process decreased and the recovery of Ag increased to 98.34%,whic
文摘:针对某厂湿火联合法处理铅阳极泥工艺存在的问题,改变了预处理条件,优化工艺结构,降低生产成本,提高了银直收率,达到98.34%,使工艺更具经济合理性。