The experimental method of the model test with 1:6 scale based on the work mechanism of bearing of steel Y-pipe strengthened inside with crescent rib in combination with surrounding rock mass simulated by composite materials is adopted and the regularity
The experimental method of the model test with 1:6 scale based on the work mechanism of bearing of steel Y-pipe strengthened inside with crescent rib in combination with surrounding rock mass simulated by composite materials is adopted and the regularity
摘要本文结合实际工程采用几何比尺为1:6的物理模型试验方法,用不同材料分层组合模拟围岩,对水电站内加强月牙肋钢岔管与围岩联合承载的工作机理、围岩分担内水压力的规律进行分析。