9 The monthly amount to be paid for the Work shall equal the percentage of Work incorporated into the Project since the last billing period, certified by the Owner, times the sum of the Cost of Work and the General Conditions Costs (calculated in the mann

9 The monthly amount to be paid for the Work shall equal the percentage of Work incorporated into the Project since the last billing period, certified by the Owner, times the sum of the Cost of Work and the General Conditions Costs (calculated in the mann

每月的工程款应相当于自上个计费期间之后所完工的工程占项目的百分比(经业主确认),乘以本次计费期间工程造价和一般条件造价之和(按书面授权书上所列方式计算),加上费用的一定比例(按书面授权书上所列方式计算),再从工程造价、一般条件造价和费用中减去百分之五(5%)作为滞留金以及先前支付款项的百分之百(100%)。