7 Before operation of the temporary bus depot at the project site, the Permit Holder shall prepare a Contamination Assessment Plan (CAP) in accordance with Section 3 of Annex 19, TM on EIA Process, and the ProPECC PN3/94.
7 Before operation of the temporary bus depot at the project site, the Permit Holder shall prepare a Contamination Assessment Plan (CAP) in accordance with Section 3 of Annex 19, TM on EIA Process, and the ProPECC PN3/94.
在工程项目地点营运临时巴士车厂之前,许可证持有人须按照《环境影响评估程序的技术备忘录》附件19第3节及《专业人士环保事务谘询委员会专业守则3/94》拟备一份污染评估计划。