Article 14 Facilities for prevention and control of environmental noise pollution must be designed, built and put into use simultaneously with the main part of a construction project.
Article 14 Facilities for prevention and control of environmental noise pollution must be designed, built and put into use simultaneously with the main part of a construction project.
第十四条建设项目的环境噪声污染防治设施必须与主体工程同时设计、同时施工、同时投产使用。