Based on the analysis of the temperature test result of the landing rectangle aqueduct of Caohe River for the emergency water supply project of the Beijing-Shijiazhuang Section on the Middle Route of the South-to-North Water Diversion Project, the tempera
Based on the analysis of the temperature test result of the landing rectangle aqueduct of Caohe River for the emergency water supply project of the Beijing-Shijiazhuang Section on the Middle Route of the South-to-North Water Diversion Project, the tempera
摘要通过对南水北调中线京石段应急供水工程漕河渡槽段落地矩形渡槽温度测试结果的分析,阐述了薄壁混凝土早期水化热温度发展的特点,提出了影响落地矩形渡槽水化热温度的主要因素与控制措施。