The pressure existing between the guide vane and the runner when the pump-turbine of East China Tongbai Pumped Storage Power Station stops at different loads is analyzed, and the method for determining the best load at which the generator circuit breaker

The pressure existing between the guide vane and the runner when the pump-turbine of East China Tongbai Pumped Storage Power Station stops at different loads is analyzed, and the method for determining the best load at which the generator circuit breaker

摘要介绍华东桐柏抽水蓄能电站的水泵运行时,不同负荷工况下停机、导叶和转轮间压力的变化,阐述了华东桐柏抽水蓄能电站1号机组发电机断路器开断的最佳负荷值选定。