Preparation for construction: the surface of the under layer should be even and firm, and in accordance with the design requirement, without loose material and flaccid site, and need to reroll 2~3 times within full-width range of the subgrade with vibrati

Preparation for construction: the surface of the under layer should be even and firm, and in accordance with the design requirement, without loose material and flaccid site, and need to reroll 2~3 times within full-width range of the subgrade with vibrati

施工准备:施工前下承层表面要平整、坚实,符合设计要求,无松散材料和软弱地点,施工前要用振动压路机在路基全宽范围内复压2~3遍,同时进行压实度及弯沉检验,检查土基中是否有不合格点。