The technological innovation and optimum design were implemented by the design organization during the working drawing period, as a result, the new technology of separated floor for draft tube bend is applied, and the optimized arrangement plan of structu
The technological innovation and optimum design were implemented by the design organization during the working drawing period, as a result, the new technology of separated floor for draft tube bend is applied, and the optimized arrangement plan of structu
施工详图阶段,设计单位根据创建节约型社会的宗旨,积极开展一系列技术创新和优化设计工作,并首创了厂房尾水管肘管段分离式底板新技术,优化设计后枢纽布置更加紧凑,建筑物结构形式更为合理,加快了施工进度,节约工程投资约1.37亿元,综合效益显著。