例句 /

Abstract: Treatment of No.2 Dumping platform landslide of Chang′an Refuse site in Chengdu were introduced in this paper.Bore pile and drainage project combinated with pressuregrouting engineering were carried out,and the comprehensive treatment gained goo

Abstract: Treatment of No.2 Dumping platform landslide of Chang′an Refuse site in Chengdu were introduced in this paper.Bore pile and drainage project combinated with pressuregrouting engineering were carried out,and the comprehensive treatment gained goo

文摘:概述成都市长安垃圾场2#倾倒平台滑坡的整治手段,实施钻孔灌注桩与疏排水相结合的压浆工程,采取的综合治理措施,获得了良好的治理效果,既可根治滑坡,又能满足2#平台的使用要求。