例句 /

11 The carrying capacity of the mud is lower, add 2~3 kg/m3 DRISPAC.

11 The carrying capacity of the mud is lower, add 2~3 kg/m3 DRISPAC.

泥浆携砂能力下降,加入2~3公斤/方的DRISPAC。