For installing and debugging the steam-turbine unit No.3 and No.4 of N125-13.24/535/535-Ⅱ in Meixian Power Plant, some measure to prevent the flexure of rotor had been adopted and what cause the faults of speed control and protection system are analyzed.
For installing and debugging the steam-turbine unit No.3 and No.4 of N125-13.24/535/535-Ⅱ in Meixian Power Plant, some measure to prevent the flexure of rotor had been adopted and what cause the faults of speed control and protection system are analyzed.
摘要简要介绍N125-13.24/535/535-Ⅱ型汽轮机在梅县发电厂#3、#4机组工程的安装、调试过程中防止转子弯曲而采取的一些措施,分析调速保安系统出现故津的原因及其处理经脸。