例句 /

Any design change or engineering change of the contracted products will result in a disposal plan of the existing finished goods stock.

Any design change or engineering change of the contracted products will result in a disposal plan of the existing finished goods stock.

供方或需方需要对本协议涉及的产品作设计或工程更改时,需协商处理已有的成品库存。