例句 /

The emergency control measures are evaluated by the severe faults scenarios in typical operating conditions including two generation-tripping and four load-shedding substations in Guangdong Power System.

The emergency control measures are evaluated by the severe faults scenarios in typical operating conditions including two generation-tripping and four load-shedding substations in Guangdong Power System.

针对广东电网典型运行方式下的严重故障进行了在2个切机子站,4个切负荷子站上的紧急控制措施分析。