例句 /

When functionality testing is being performed following the completion of the trial operation of wastewater, sewage or sludge treatment facilities, the engineer shall conduct an on-site check to determine whether the enterprise′s wastewater, sewage and sl

When functionality testing is being performed following the completion of the trial operation of wastewater, sewage or sludge treatment facilities, the engineer shall conduct an on-site check to determine whether the enterprise′s wastewater, sewage and sl

五废(污)水处理及污泥设施完成试车,进行功能测试时,前往现场查核事业之废(污)水与污泥产生量、作业系统、废(污)水与污泥处理操作状态、取样位置、数量、频率是否符合规定及相关纪录是否确实。