例句 /

The facilities for prevention and control of water pollution must be designed, constructed and put to use or into operation simultaneously with the main part of a construction project.

The facilities for prevention and control of water pollution must be designed, constructed and put to use or into operation simultaneously with the main part of a construction project.

建设项目中防治水污染的设施,必须与主体工程同时设计,同时施工,同时投产使用。