Based on the analysis of the monitoring data during construction and the settlement of stacking yard surveyed after 2 years' operation, this paper introduces the design and construction of SCT2 Ground Treatment Engineering, and main technical problems suc

Based on the analysis of the monitoring data during construction and the settlement of stacking yard surveyed after 2 years' operation, this paper introduces the design and construction of SCT2 Ground Treatment Engineering, and main technical problems suc

摘要结合施工过程中的各项监测数据及堆场使用2年后的沉降情况,介绍SCT2地基处理工程的设计、施工情况,以及施工中存在的引孔、边界处理等主要技术问题及其解决办法。