例句 /

3 To minimize impacts due to improper disposal of debris, all debris shall be loaded into sandbags and be removed from site at the end of each working day during the construction and dismantling period of the Project.

3 To minimize impacts due to improper disposal of debris, all debris shall be loaded into sandbags and be removed from site at the end of each working day during the construction and dismantling period of the Project.

为减轻因不当处置垃圾造成的影响,在工程项目建造及拆卸期间的每个工作日完结前,须把全部垃圾放入沙包,然后搬离工地。