The design of the downstream water supply during the construction of Yunlong Reservoir is presented, in which the problem from the downstream water supply during the construction period of the flood discharge tunnel, the main dam, the initial impoundment

The design of the downstream water supply during the construction of Yunlong Reservoir is presented, in which the problem from the downstream water supply during the construction period of the flood discharge tunnel, the main dam, the initial impoundment

摘要著重介绍云龙水库施工期下游供水设计,根据工程特点,较好地解决泄洪导流隧洞施工期、大坝施工期、水库蓄水、导流隧洞封堵施工期等下游供水问题,施工方法简单,确保了下游供水,取得了较好的社会和经济效益。