例句 /

After the project was put into operation, the annual throughput per berth exceeded more than 1.1 million TEUs at a time.

After the project was put into operation, the annual throughput per berth exceeded more than 1.1 million TEUs at a time.

文中通过对设计中的一些亮点的总结,使集装箱码头设计水平有了进一步提高。